UFGS 23 52 43.00 20 Low Pressure Water Heating Boilers (Under 800,000 BTU/HR Output)  

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA Action Change # Nature of Change or Revision
Aug-2018 N C 2

Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Aug-2015 N C 1

UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".

May-2015 N R

Revised throughout to incorporate CCRs 1006, 4267, and 2584. Modifications included references, boiler installation requirements, detail drawings, water analysis, safety standards, submittals, efficiency requirements, general requirements, controls, safety features, operational tests, and acceptance operational test and inspection.

Jul-2006 N R

Added sustainable design requirements