UFGS 23 52 33.01 20 Steam Heating Plant Watertube (Shop Assembled) Coal/Oil or Coal  

History: Below is a listing of the Revisions and Changes made to this UFGS.

KEY PREPARING ACTIVITY (PA) A Army N Navy F Air Force S NASA
ACTION N New R Revision C Change D Deletion
Release PA Action Change # Nature of Change or Revision
Feb-2022 N C 3

Under Related Requirements, "VAMS 23 09 53.00 20 CONTROLS AND INSTRUMENTATION BOILER PLANT" replaced with "UFC 3-430-11 BOILER PLANT INSTRUMENTATION AND CONTROL SYSTEMS"; also, the term "VAMS" has been removed throughout this section.

Aug-2018 N C 2

Sustainability updates required to coordinate with the Federal Codes and DoD policies and procedures.

Aug-2015 N C 1

UFGS sustainability/energy updates to comply with Navy and DoD policies to enforce requirements of UFC 1-200-02 "High Performance and Sustainable Building Requirements".

Nov-2008 N R

Deleted references to ASME B16.20

Jul-2007 N R

Modified for non-asbestos use.